Now that we have many technicians claiming to be experts in renewable energy installations, the following may help to checkmate the incompetent ones.
FOR YOUR SOLAR HYBRID INVERTER SOLUTION ASK YOUR VENDOR/INSTALLER:
- DO YOU HAVE DRAWINGS TO GRAPHICALLY EXPLAIN YOUR WORK PLAN?
- IF YES, ASK THE VENDOR TO GIVE YOU FOR STUDY- SEND SUCH TO US TO REVIEW WITHIN A DAY OR TWO AND GET BACK
- ARE YOU PROVIDING SEPARATE DISTRIBUTION BOARD PER FLOOR TO MANAGE INVERTER LOAD FROM
- ARE YOU PROVIDING SURGE PROTECTION?
-ARE YOU PROVIDING DC BATTERIES DISCONNECTOR?
- ARE YOU PROVIDING SOLAR DC DISCONNECTOR?
- ARE YOU PROVIDING SYSTEM BYPASS BACK TO GENERATOR OR PUBLIC POWER IN THE EVENT THE SOLAR INVERTER SYSTEM IS OUT FOR MAINTENANCE
- HAS THE BUDGET FOR THE WORKS CONSIDER THE PECULIARITY OF MY FACILITY AS REGARDS ROOF TO BE USED,WHERE BATTERIES SHALL BE LOCATED AND WHERE THE VARIOUS LOAD CONTENTS ARE AND HOW THEY ARE CURRENTLY WIRED.
-AT WHAT EXTRA COST WILL ALL THE CONCERNS BE ADDRESSED?
Compare the responses and the relative cost with other vendors and then make your decision.
HOWEVER, FOR SUPERVISORY ENGAGEMENTS, WE SHALL DO ALL THAT AT 5% OF THE VALUE OF SUCH PROJECT BEING N50,000.00 PER KVA. LAGOS COST. OUR CHARGE BEING N25,000.00 FOR OVER THE PHONE, VIDEOS AND PICTURES REVIEW.