Wednesday, 11 January 2017

NATOSELL CLEARANCE SERVICES

This is to officially launch Hiworks Clearance Services and sorry not import export services but for home and office sales, used vehicles,  construction equipment, office and home appliances and just about anything you would like to convert to cash value or trade for something else.

We have developed a huge followership across the country on social media and also sales closures on OLX and such platforms.

We push your product(s) at a charge next to nothing online and you keep all your profit less VAT plus our 5% fees.

Cost primarily for verification and logistics of profiling products in view.

All enquiries to Festus on this no +2348051158191. You can also whatsapp the same.

Otherwise email hwsl-natosell@gmail.com.

Wednesday, 4 January 2017

Engineering Services Value Plus Peace Of Mind Won't Cost A Fortune

Engineering Services Value Plus Peace Of Mind Won't Cost A Fortune

From Odusina Adewale Hiworks

Apparently, this is the greatest fear of prospective clients in need of Engineering services of various kind.

The other apprehension expressed generally is that engineers slow construction work down and so engaging and deploying experienced artisans directly (without Engineering plan and oversight) is their alternative.

Pardon me,  a 2 bedroom apartment construction will not cost less than 2.5million naira. How can one invest than without a guarantee??? Sorry if you are doing this already, I have a song for you ... How dumb you are... How.... Dumb..... You..... Are..... and no apologies if these gets you offended.

Ignorance is a terrible thing and most people with the above school of thought are short changing themselves.

The primary need for engaging engineers is to ensure value for the financial resources being deployed into the project while not compromising the integrity of the quality of all the works.

If both the client and the Engineer are on the same page in the above position, then it implies having engineers on board should deliver cost effective and efficient building construction works.

Quality Engineering Input on any project contributes additional 10-35% to the cost of actual materials required. That is what you pay for the peace of mind. Note also that part of this % is total labour charges.

Peace of mind does not have to be Mercedes Benz; you can simply do a TATA or Kia, Toyota, Nissan, Haundi, Honda;  that is the logic behind 10-35%. Simply look for your size.

It is foolishness to deploy hard earned income into a construction business without the integrity rating  qualified engineers give.

Little wonder,  the spate of building collapse,  plumbing leakages and building fire to mention a few.

So,  buy peace of mind,  allow for Quality assurance; Engage Sound Engineers like Hiworks Services Limited.

We are available to service any size and class of customers.

Talk to us today.

Thursday, 29 December 2016

Flats For Rent at Soluyi Area, Gbagada,  behind Deeper Life, Lagos State. 

Flats For Rent at Gbagada behind Deeper Life. 

All 3-bedrooms, Ground floor is 950k,  middle floor is 1000k,  while the pent floor is 900k per annum,  Caution and Agreement for 1year and      10%. Agency is also 10% for 1 year. 

Call Damilola Ayanjinrin on 08023829354 for more information and inspection.

Tuesday, 13 December 2016

Electrical Charges

http://www.ikejaelectric.com/ikedc-customer-energy-charges-nkwh/

Power Factor Calculation

https://www.google.com/amp/www.electricaltechnology.org/2013/11/How-to-Calculate-Suitable-Capacitor-Size-for-Power-factor-Improvement.html/amp/

Thursday, 20 October 2016

You Can Save 10-50% on Your Electrical Energy Services Cost 

Proposal For Building Audit & Power Factor Correction System

From Hiworks Services Limited 
hwsl2014@gmail.com & +2348037871708

This applies to Bulk Power Consumers like Estate,  Hospitality facilities, Corporate Facilities, Religious Centres, Event Centres etc

You can save 10-50% on your electrical energy services cost if you invest in power factor correction. See mathematical analysis later in this piece. 

Breaking it down literally, normal electrical operations is at 0.8pf. Best practices is from 0.9pf.  Your Kwh rate at 0.9pf is probably around N40, at 0.8pf kwh is probably N49 already indicating you pay an extra N9 per kwh for operating at 0.8. When you operate lower at 0.7pf,  you probably pay extra N15 and at 0.6pf,  you could be paying extra N22 per kwh. 

Check your bill for your last total KWH and you will see the need to modify your electrical system. 

Whenever an Electrical System load is predominantly Inductive (sorry for another electrical Jagon) meaning you have more of load contents like Airconditioners which is over 75% of the load content, lift equipment, hand driers and various pumps and you don't have a power factor correction equipment incorporated, you are automatically spending 10-50% more on your energy budget whether it is public power, or generator power.

Understanding Power Factor Correction (PFC) is the first step towards experiencing the many benefits associated with good power factor. Poor power factor means poor electrical efficiency and in turn, the lower the power factor, the higher the apparent power drawn from the distribution network.

One side effect of this is higher capital expenditures and operating costs for distributors, which in many cases is passed on to the consumer in the form of higher tariff rates.

Why Promote this product after the huge investment in power distribution equipment and cabling. 

The answer is that if your facility is currently not having a power factor corrector, you are spending at least 8 to 10% more in your power deployment in a normal system and could be 20 to 50% in a very dysfunctional electrical systems with old lift, old air-conditioning, old pumps,  old factory equipment etc. 

Can you now imagine the savings monthly and yearly? 

For example:

A typical Bank branch is about 100kW or 125kVA at 0.8pf and 105.3kVA at 0.95pf. The kVA Being 133.3 at 0.75pf. 

In view of load profiling the bank may be off peak from 7-9am at 50kw,  peak 80kw from 9-3pm, off peak 50kw from 3-7pm and be on 27kw over night till 7am. 

All adding up to 904kwh daily. At 0.8pf,  the bank will pressure their profit margin by N9 penalty charge x904kwh  being N8,136.00 daily, about N253,000 monthly and about N3million yearly. 

For a technical approach see below. 

100 kW load at a PF of 0.8= 75 kVAr 
100 kW load at a PF of 0.9 = 49kVAr 

The extra kVAr drawn from the supply is:

75kVAr – 49kVAr = 26 kVAr
26 x Npenalty charge per hr x 24hrs= Npenalty perday

A typical bank branch office with 100kVA load profile may be charged this extra monthly unless the system is improved with adequately sized Power Factor Corrector. 

Assume the Power factor correction unit will cost installed about N60,000 per kVAr
Therefore 26.0 kVAr x N60000 = N1,170,000
Payback period = N1,560,000 divided by N253,000 = about 6months.

In about 6 months, the cost for power factor correction is recovered and any further penalties are avoided for the life of the electrical installation. Any further savings then become profits that add to the company’s bottom line.

Imaging this as savings or additional profit in over 100 branches.

Note: This example is for illustration purposes only. Actual savings will vary from installation to installation.


PFC is a means of providing compensation locally to reduce this excess power draw which can result in electricity bill savings, reduced system losses and optimal utilization of energy resources and transformer capacity.

 HIWORKS can help size, commission and maintain your chosen PFC system. With the flexibility to suit your application requirements.
We shall also require to carry out your electrical audit to see the energy use trend and use some of the information to develop the power factor capacity for the power system.
We shall be available for further clarification of the development.
ODUSINA, ADEWALE F
Engineering Services
Hiworks Services Ltd.
2, Alfa Sanni Street,Pedro, Shomolu,Lagos.
Tel. : +2348025357926,+2348037871708
Email:hwsl2014@gmail.com, adewaleodusina@gmail.com





Power Factor Corrections


Whenever an Electrical System load is predominantly Inductive (another Jagon) meaning you have more of load contents like Airconditioners which is over 75% of the load content, lift equipment, hand driers and various pumps and you don't have a power factor correction equipment incorporated, you are automatically spending 15-50% more on your energy budget.
Understanding Power Factor Correction (PFC) is the first step towards experiencing the many benefits associated with good power factor. Poor power factor means poor electrical efficiency and in turn, the lower the power factor, the higher the apparent power drawn from the distribution network.
One side effect of this is higher capital expenditures and operating costs for distributors, which in many cases pass on to the consumer in the form of higher tariff rates.
PFC is a means of providing compensation locally to reduce this excess power draw which can result in electricity bill savings, reduced system losses and optimal utilization of energy resources and transformer capacity.
 HIWORKS can help size, commission and maintain your chosen PFC system. With the flexibility to suit your application requirements.
We shall also require to carry out your electrical audit to see the energy use trend and use some of the information to develop the power factor capacity for the power system.
We shall be available for further clarification of the development.
ODUSINA, ADEWALE F
Engineering Services
Hiworks Services Ltd.
2, Alfa Sanni Street,Pedro, Shomolu,Lagos.
Tel. : +2348025357926,+2348037871708
Email:hwsl2014@gmail.com, adewaleodusina@gmail.com