Tuesday, 9 April 2024

Photovoltaics Solutions Advantage by Hiworks

Photovoltaics Solutions Advantage by Hiworks

Today, in Nigeria, petrol is averaging N600 per liter. 
The smallest 0.8kW petrol generator called 'I pass my neighbor' will consume N300 per hour at full load. With 10 hours daily, that will be N3000 worth of fuel consumption. 
In a month, the cost of consumption will be N90,000 and also N1,080,000.00 yearly.
 
The Nigerian Electricity Regulatory Commission (NERC) on April 3, 2024, raised the electricity tariff for customers enjoying 20 hours of power supply daily. Customers in this category are said to be under the Band A classification. The increase will see the customers paying N225 kilowatt per hour from the current N66, a development that has been heavily criticized by many Nigerians, considering the immediacy of the tariff hike and the current hardship in the land. NERC Commissioner for Planning Research and Strategy, Yusuf Ali, was on Channels Television’s Politics Today programme during the week and he provided perspectives to what informed the decision of the regulatory body.  https://www.channelstv.com/2024/04/06/why-new-electricity-tariff-took-immediate-effect-nerc-commissioner/ 
Service Band Tariff /Rate/Amount
From  https://ekedp.com/tariff-plans   
SERVICE BAND A 
(Minimum of 20hrs a day) MD1-ANGN 225.00
SERVICE BAND B   
(Minimum of 16hrs a day) MD1-BNGN 64.07 
SERVICE BAND C
(Minimum of 12hrs a day) MD1-CNGN 52.05 
SERVICE BAND D
(Minimum of 8hrs a day)MD1-DNGN 43.27  
SERVICE BAND E 
(Minimum of 4hrs a day)NMD-ENGN 32.44     

Above are the realities; public power provider guarantees no one 24 hours and what is mentioned is still ideal of some sort.
Everyone must provide from 4 to 20 hours based on the catchment area available band and the business consideration by the provider.
Hence, for a 24-hour power supply, with the smallest genset earlier mentioned (0.8kW), and 4 liters running for eight hours for a new generator, the cost is N2400 for 0.8kW x 5 hours (4.0kWh). That will be N600 per kWh. 
Obviously, the cost is more than the highest kWh charge by any public power provider in Nigeria and most independent power provider (IPP) solution providers.
Diesel cost (which must include Depreciation & maintenance costs) will be around N400 -N600 per kWh or more. It is important to factor in depreciation & maintenance for diesel gensets.
The truth is, that the equivalence of that sum in the Solar inverter will last for at least two years or longer. That is 4nos batteries 12V 200AH Lead Acid batteries... With different product types and benefits... 
 Lead Acid batteries can be flooded or dry. They can be dry valve regulated or gel. Or absorbed glass mat. AGM. 
 As beautiful as all that is, there is more when you go Lithium batteries and value moves to 5 to 10 years for spending twice and a little more... 
 Lithium batteries will cost at least twice as Lead-acid batteries, but lithium batteries last 8 or even 10 cycles longer than Lead Acid batteries. Also, Lithium batteries maintain their full voltage almost at the end of their charge life, while Alkaline batteries reduce their voltage output throughout their performance.
 When your lifestyle is such that you are only home at night most time, your solution may be 40% less expensive than your counterpart with a similar load profile because you will ONLY be storing energy in the daytime.
 When your need is to support office operations from 8 to 5 pm, your acquisition cost will be less expensive compared to doing 24 hours or for residential apartments. 
 Whatever your need, seek professional advice from reliable experts like Hiworks... Your inquiry and orders are awaited.Hiworks

Saturday, 14 November 2020

2nos General Elevator from Spain available locally in Lagos, Nigeria for immediate pickup

2nos General  Elevator  from Spain available locally in Lagos, Nigeria for immediate pickup

1. 6 passengers  450kg,  5stops 5opening
Traction  M R  side opening Door  800mm clear 
2.  8 passengers  630kg  5stops  5opening  Traction  M R side opening Door  800mm clear , Panoramic view at the rear (BACK)

Please the  entrance details are structurer  opening,  clear opening are,  700mm to 800mm  respectfully.

450kg  6 passengers  #20m installation  #2.5m  = 22.5m  
630kg  8passengers  panoramic  #23m plus  installation  #2.5m  = #25.5m. 



ODUSINA, Adewale F (Engr.)
Managing Partner
Hiworks Services Ltd.
4,Eunice Tutorial Close,
Gbagada Phase 2,
Behind Mobil Filling station, Gbagada.
Lagos, Nigeria.
Tel:+2348051158191, +2348025357926, +2348037871708

Email:hwsl2014@gmail.com, adewaleodusina@gmail.com

https://www.linkedin.com/in/adewale-odusina-bb1b4a7

We Must Be Ready, Willing & Able, To Expose Our Reputation Of Strong Business Ethics To A Great Risk, if We Must Build A Great Business.

Lift specifications

TYPE. PANORAMIC AT THE REAR
CAPACITY. 8PASSENGERS (630KG)
NO. OF STOPS. 5STOPS / 5OPENINGS
SPEED. 1.0M/S
TOTAL TRAVEL. 20100MM
OVERHEAD. 3900MM
HOIST WAY SIZE. 1500MM(W) X 1830MM (D)
PIT. 1400MM
CONTROL SYSTEM. VVVF
OPERATION. SIMPLEX PUSH BUTTON CONTROL UP AND DOWN.
POWER SUPPLY. AC415V 3PH 50HZ FOR POWER, AC220V 2PH FOR LIGHTING.

SAFETY DEVICES AND SPECIAL FEATURES. SPEED GOVERNOR, AUDIBLE OVERLOAD PROTECTIVE DEVICE, EMERGENCY STOP AND CALL BUTTON PROVIDED ON CAR OPERATION PANEL BOARD. EMERGENCY CAR LIGHT WHICH WILL LIGHT DURING 30MINUTES OF POWER FAILURE, ANTI STRAPPING DEVICE.

CAR & LANDING DOORS. POWER OPERATED CENTER OPENING AND 2PANNEL CENTRAL OPENING WITH MECHANICAL INTERLOCK . A STAINLESS STEEL LANDING DOORS.

CONSTRUCTION. 1:1
DOOR OPENING. 1100MM
CAR ENTRANCE. 2200MM.


 Lift specifications
TYPE. CONVENTIONAL TYPE
CAPACITY. 6PASSENGERS (450KG)
NO. OF STOPS. 5STOPS / 5OPENINGS
SPEED. 1.0M/S
TOTAL TRAVEL. 20100MM
OVERHEAD. 3900MM
HOIST WAY SIZE. 1400MM(W) X 1920MM (D)
PIT. 1400MM
CONTROL SYSTEM. VVVF
OPERATION. SIMPLEX PUSH BUTTON CONTROL UP AND DOWN.
POWER SUPPLY. AC415V 3PH 50HZ FOR POWER, AC220V 2PH FOR LIGHTING.
SAFETY DEVICES AND SPECIAL FEATURES. SPEED GOVERNOR, AUDIBLE OVERLOAD PROTECTIVE DEVICE, EMERGENCY STOP AND CALL BUTTON PROVIDED ON CAR OPERATION PANEL BOARD. EMERGENCY CAR LIGHT WHICH WILL LIGHT DURING 30MINUTES OF POWER FAILURE, ANTI STRAPPING DEVICE.

CAR & LANDING DOORS. POWER OPERATED CENTER OPENING AND 2PANNEL CENTRAL OPENING WITH MECHANICAL INTERLOCK . A STAINLESS STEEL LANDING DOORS.

CONSTRUCTION. 1:1
DOOR OPENING. 900MM
CAR ENTRANCE. 2200MM.

Sunday, 1 November 2020

Hiworks Can Facilitate Shipment From OEMs in China, Turkey, Dubai and India

Hiworks can facilitate alongside our partners to ship from China, Turkey, Dubai, and India original materials and save cost for the construction project.

When we ship from China it is different. Most of the products that we use today and indeed most of the brands we are used to and patronize credit China for their production.

Check around your house to see what is written on the body of all your appliances or the boxes. You will likely find made in China on one out of three items.

China is graced with the right environment, across the value chain of production; their government enabling of their industrial sector is too attractive for anyone looking at mass production of just about anything.

The cost of production of an item can go from   $100 to $30 when you order from 500 pieces to 5000 pieces.

You can't beat their ease of logistics for moving the produced goods from their factories to the various countries' local ports.

This is why most of the investment in production starts the first phase in China and the packaging phase in the respective countries selling the goods.

When you have the benefit of that whole information, it becomes laughable when people say Chinese products are synonymous with inferiority.

The popular parlance is 'is it original or China ' or you are 'enlightened ' by the vendor that there is available for you at different prices two similar products; the costlier being the original version, the cheaper being the China version and you are shown. When you closely observe, you will note that one is actually a superior quality than the other. 

The truth is that most times both products shown to you originated from China, and sometimes the same company made the two or different companies in the same China Province or State as we know it here.

What is different is the SPECIFICATION given to the manufacturers to produce what is seen to be original and that given to the manufacturer to produce the version that is tagged inferior or China.

Sometimes, the variances of inferior quality may be up to ten in the market and selling at various cost differentials.

You might have been a victim of that before where you actually went to the market to buy a Panasonic appliance and you were given PANSONIC or PANASUNIC or PANTRONIC or worse and this items will look exactly the same until you get home and discover ' if it's not panadol, it is not the same as panadol'.

Now that you know that PANASONIC AND PANTRONIC originated originally from China and the cost differential of production of both may not be that considerable. It may just be that PANASONIC came from Japan, with original production in China or it came from an EU country but the original production in China.

The implication of that being an extra cost of logistics and taxes on the products before being shipped to the end-users countries.

In monetary terms, a product routed through Japan to Africa will incure cost of shipping and taxes to Japan, extra cost of labour and taxes for packaging in Japan and cost of shipping to Africa.

The cost savings when produced goods are shipped straight from China to end-users countries may sometimes be up to 50%  than when they are routed through the country of note for the label on the appliance.

Sometimes the savings are so notable on a construction cost when the building materials are shipped from the original equipment manufacturers in China, or Turkey or India or anywhere else.

That is one of the reasons countries that produce what they consume are stronger economies.


The only challenges to the exploration of this cost savings strategy for construction are access to the original equipment manufacturers(OEMs) and the lead time of up to 90days and in some cases up to 150days.

If the window of 90days to 150days exist to get the specifications right, to get the right Chinese factory, make necessary payment, commence production, ship finished goods and deliver the goods to the end-users, the savings between buying original goods and exploring this window for original quality products may sometimes be about 30-50%.

We therefore await your next order for discussions.

Thursday, 14 November 2019

9w LED intelligent emergency light - Huge savings on fuel

9w LED intelligent emergency light - Huge savings on fuel

N2000.00 Flat

For ordering WhatsApp +2347053595893

Advantages: Replace current household light bulb with the unique Light Bulb.emergency lighting, automatic power outage, the power of your home light, normal lighting. 

Function: Emergency LED Light Bulbs adopts identifying circuit, in high-voltage lighting it will recharge itself and be with overcharge protection. Once there is power failure, it will immediately start DC lighting (lighting control switch can also control DC lighting and high-voltage lighting on or off in order to achieve you desire). 

About 3-5 hours of continuous illumination. With accurate protection function, comprehensive use of electronic contactless control, low power consumption, effectively improve the service life.When you put them on the water,the light also will on. 

Suitable for hotel, dining room, guest room, office, show room, shop, corridor,go camping etc. 

HIWORKS mission

Our altimate goal is a complete Solutions company in building services but the goal is not profit but indigenous capacity Developments through the opportunities  we get for projects.

Monday, 19 August 2019

Hiworks Services Limited guarantees Serenity

You have all in one place from concept to model, from costing to ground opening, from the first block to roofing and from the first pipe to the first cooking, Hiworks Services Limited guarantees Serenity; You can travel from tenancy and move straight in to your masterpiece. The most for your purse is fully guaranteed.

Hiworks Services Limited, all in one place for your construction need.

ODUSINA, Adewale F (Engr.)
Managing Partner
Hiworks Services Ltd.
Gbagada, Lagos, Nigeria.
Tel:+2348051158191,  +2348037871708
Email:hwsl2014@gmail.com, adewaleodusina@gmail.com
https://lnkd.in/gdQyvDW

We Must Be Ready, Willing & Able, To Expose Our Reputation Of Strong Business Ethics To A Great Risk, if We Must Build A Great Business.

Wednesday, 5 June 2019

Prayers For Sanity and Prosperity of Nations

Lord make Political Positions uninteresting to unfaithful persons.

Lord rain down Judgement upon everyone that have impoverished this nation under the cover of politics and policy formations.

Lord let there be a massive voluntary resignation around the world of politicians in office as a means to amassing illegal wealth and not servitude.

Lord bring Sanity and Strength to all our Institutions, to the end, the voice of the most 'nobody' now feels counted in the citizenry.

Lord bring sanity to our Justice system and Reform to our Prison system to the end they serve the purpose of Reformation and not further Deformation

Lord bring freedom to All the victims of the poor Justice System this year and shut the prison door against everyone that has cause decay in government.

Lord we End the rain of kidnapping, oppression of herdsmen, rain of suicide mission and every crime against humanity that are trying to gain ascendancy to the end we loose faith in God and Government because as children of God whatever we End here is ended in Heaven.

Lord Rain Prosperity and in the Jubilation, let everyone that is not concurring be ended in the stampede of excitement.Let the Rain of progress also bring judgement to the wicked and the unreasonable people.

Saturday, 6 April 2019

Hiworks Procurement Advantage Through Premium Brand OEMs

At Hiworks, we are continually growing our pool of Original Equipment Manufacturers (OEMs), producing for the European & American Communities, to the end that we can cut off cost content associated with routing logistical charges, by producing and shipping directly to the end user's country.

The gain is sometimes over 50% of the premium brand cost.

We can bring the benefit to Construction Projects , Developers and End Users.

Call us when you need such supports.

Tuesday, 22 January 2019

Solar Inverter Technical Works Checklist

Solar Inverter Technical Works Checklist

Now that we have many technicians claiming to be experts in renewable energy installations, the following may help to checkmate the incompetent ones.

FOR YOUR SOLAR HYBRID INVERTER SOLUTION ASK YOUR VENDOR/INSTALLER:

- DO YOU HAVE DRAWINGS TO GRAPHICALLY EXPLAIN YOUR WORK PLAN?

- IF YES, ASK THE VENDOR TO GIVE YOU FOR STUDY- SEND SUCH TO US TO REVIEW WITHIN A DAY OR TWO AND GET BACK
-  ARE YOU PROVIDING SEPARATE DISTRIBUTION BOARD PER FLOOR TO MANAGE INVERTER LOAD FROM

- ARE YOU PROVIDING SURGE PROTECTION?

-ARE YOU PROVIDING DC BATTERIES DISCONNECTOR?

- ARE YOU PROVIDING SOLAR DC DISCONNECTOR?

- ARE YOU PROVIDING SYSTEM BYPASS BACK TO GENERATOR OR PUBLIC POWER IN THE EVENT THE SOLAR INVERTER SYSTEM IS OUT FOR MAINTENANCE

- HAS THE BUDGET FOR THE WORKS CONSIDER THE PECULIARITY OF MY FACILITY AS REGARDS ROOF TO BE USED,WHERE BATTERIES SHALL BE LOCATED AND WHERE THE VARIOUS LOAD CONTENTS ARE AND HOW THEY ARE CURRENTLY WIRED.

-AT WHAT EXTRA COST WILL ALL THE CONCERNS BE ADDRESSED?

Compare the responses and the relative cost with other vendors and then make your decision.

HOWEVER, FOR SUPERVISORY ENGAGEMENTS, WE SHALL DO ALL THAT AT 5% OF THE VALUE OF SUCH PROJECT BEING N50,000.00 PER KVA. LAGOS COST. OUR CHARGE BEING N25,000.00 FOR OVER THE PHONE, VIDEOS AND PICTURES REVIEW.

HIWORKS.
+2347053595892
hwsl2014@gmail.com

Monday, 21 January 2019

HIWORKS MEP BUILDING SERVICES PROJECTS ENGAGEMENTS SOME HIWORKS PROJECTS ENGAGEMENTS SINCE 2014

Supply Of Electrical Panel and Water Treatment Plant for Gbagada Guest House.
Proposed Mechanical & Electrical Design & Supervision Services For Gbagada Guest House.
Contract Award For The Olorunda Estate Power Infrastructure & Condition Report And Proposed Remedial Works.
Design & Supervision of  Mechanical & Electrical Services For PROPOSED DAYSPRING APARTMENT at Plot 12, Aremo Adesegun Oniru Crescent, Oniru Chieftaincy Family Estate, Victoria Island Annexe.
Installation of Gate Automation System, Video Door Phone, Intercom,Data Connection, CCTV for Residential development at Osapa London.
Supply Of Electrical Panel and Lightning Prevention Equipment for Residential development at Osapa London.
Eti-Osa Local Government Area, Lagos State. Proposed Mechanical & Electrical Services For Residential  Development (Duplex) At Alaka, Surulere, Lagos State.
Proposed Mechanical & Electrical Services For Residential  Development (Duplex) At Magodo, Lagos State.
Remodeling of Olive Tree Parish Church, RCCG(Nigeria Vice Presidents Church), Banana Island, Lagos, Nigeria, in Partnership with P3 Multimedia, a US based Firm, with the Brief to Provide Smart Lighting, Video, Sound and Central Monitoring Control System.
MEP Design Audit & Remodeling Design & Supervision For Hybrid Services Limited Office Development (Safety Consultants).
MEP Design Audit And & Supervision For The Proposed Ogba Ultra-Modern market Development For At Ogba, Lagos Housetop architects as Project Managers. (2500kva Load Profile)
MEP Fire Safety Design Audit of Nigeria Egina FPSO Fabrication Yard For the Construction Of Oil & Gas Offshore Vessles in Partnership with Hybrid Consulting Limited. (Over 4MVA Load Profile)
MEP Design Audit For The Proposed Banwo-Ighodalo Office Development At Ikoyi, Lagos SAVANT Integrated Concepts Limited as Project Managers. (500kva Load Profile)
Electrical Systems Condition Survey & Power Audit Report For ATLANTIC HOUSE behind Silverbird Galeria At Victoria Island, Lagos State for On Behalf Of Abbot Engineering Co. Ltd. (1000kva Load Profile)
Proposed Mechanical & Electrical Services For Private Residential Development At Block K, Lot 6, Twin Lakes Lekki  Eti Osa Local Government Area Lagos State. Client Being Mr Livingstone Izu And Mrs Abimbola Izu.
Design & Supervision of the Proposed Residential Development (Windsails), Twin, Semi-Detarched at Osapa London, Eti-osa Lga, Lagos State. 100KVA Power Capacity.
Design & Supervision of the Proposed 8Nos Terrace Houses Dev. (Soteria) At Pioneer Tekof Road, Osapa London, Eti-osa Lga, Lagos State. 200KVA Power Capacity.
Design & Supervision of the Proposed Remodeling For RCCG Dominion Santuary Church-a Zonal HQ, Acme Road Ikeja. 500KVA Power Capacity.
Mechanical & Electrical Installation Services for the Proposed Executive 16 room Guest House At Ajao Estate For Associated Vantage Limited. (300kva Load Profile)
The Design & Construction Of 630A Main Lv &  630A ATS/AMF Panel For The Proposed Phamaceutical Storage Facility at Oregun, Lagos. At 28, Olanrewaju Street,off Billings Way Oregun, Lagos, Nigeria.
Proposed Design review For The Proposed Phamaceutical Storage Facility at Oregun, Lagos.
Proposed Mechanical & Electrical Design for  2MVA, Town Houses At Abeokuta For Oba Dosumu.
Design And Supervision Celestial Church Of Christ, Surulere, Lagos. (2000kva Load Profile)
Project Support For Technomec Consults, Ramcon Electro-mechanical Ltd., CSA Engineering Services,
Product Awareness Facilitation For Jaquar-sanitary Manufacturer From India, Legrand, Fabricair Dispersion System From Germany, Westafco From Dubai
Outsourced MEP Design Development For The Proposed 750KVA, 60 Town Houses Estate Development At Wuye District, Abuja Partnering with Hony Fest Engineering Company & Design Architect Being Design Alliance, Lagos.
Complete Installation Commissioning And Handover Of Mechanical And Ancillary Services For The Proposed 19Nos Town Residential Development For Imperial Estate  Quarters, 796 & 798 Along Oba Biladu Str. Agodi  Ibadan Oyo State.
Design & Supervision of the Proposed Mixed Use Development (About 20Nos Residential Apartments and Commercial Facility for Conferences & Events) at Lekki, Lagos - State. 750KVA Power Capacity.
Design & Supervision of the Proposed Residential Development (17Nos Apartments) At Plot 23b, Oduduwa Street G.R.A, Ikeja Local Govt. Area, Lagos - State. 300KVA Power Capacity.
Proposed Mechanical & Electrical Services For Private Residential Estate Development At Ilasan, Lekki  Eti Osa Local Government Area Lagos State. For Oshea Projects Ltd.
Electrical Systems Condition Survey & Power Audit Report For Healing Stripes Hospital Opposite Four Points Hotel At Victoria Island, Lagos State On Behalf Of Nayest Ltd.
acility Mechanical & Electrical Services Audit & Advisory for Dominion Santuary RCCG, Acme Road, Ogba, Lagos.
Proposed Mechanical & Electrical Services For Private Residential Estate Development At Proposed Jubilee Estate Development Camp Overflow Ogun State. For Jubilee Mortgage Bank.

Thursday, 19 July 2018

Water Closet (WC) with Lift Technology

Call Hiworks, if you need this toilet with lift technology to keep senior citizens, our Elderlies independent. Shipping within 2months. #shipping #toilets #independence

Watch the video from the link below:

https://youtube.com/8ekiyFm2wVg

Saturday, 9 June 2018

Engineering Services Value Plus Peace Of Mind Won't Cost A Fortune

Engineering Services Value Plus Peace Of Mind Won't Cost A Fortune

From Odusina Adewale Hiworks

Apparently, this is the greatest fear of prospective clients in need of Engineering services of various kind.

The other apprehension expressed generally is that engineers slow construction work down and so engaging and deploying experienced artisans directly (without Engineering plan and oversight) is their alternative.

Pardon me,  a 2 bedroom apartment construction will not cost less than 2.5million naira. How can one invest that without a guaranty??? Sorry if you are doing this already, I have a song for you ... How dumb you are... How.... Dumb..... You..... Are..... and no apologies if these gets you offended.

Ignorance is a terrible thing and most people with the above school of thought are short changing themselves.

The primary need for engaging engineers is to ensure value for the financial resources being deployed into the project while not compromising the integrity of the quality of all the works.

If both the client and the Engineer are on the same page in the above position, then it implies having engineers on board should deliver cost effective and efficient building construction works.

Quality Engineering Input on any project contributes additional 10-35% to the cost of actual materials required. That is what you pay for the peace of mind. Note also that part of this % is total labour charges.

Peace of mind does not have to be Mercedes Benz; you can simply do a TATA or Kia, Toyota, Nissan, Haundi, Honda;  that is the logic behind 10-35%. Simply look for your size.

It is foolishness to deploy hard earned income into a construction business without the integrity rating  qualified engineers give.

Little wonder,  the spate of building collapse,  plumbing leakages and building fire to mention a few.

So,  buy peace of mind,  allow for Quality assurance; Engage Sound Engineers like Oshea Projects Limited, Shell Concepts Limited, CCP, Ramcon ElectroMechanical Limited, Hiworks Services Limited and many others.

We are available to service any size and class of customers.

Talk to us today.

Tuesday, 9 May 2017

Hiworks offers

ANSELL UNITY 150 LED DOWN LIGHT.

AVAILABLE IN 36W (COMPARABLE TO 2X42W PLC/70W HQI)

COOL WHITE DELIVERS 3385LM.

PRICE: N54,000+VAT.

ANSELL UNITY 150 DHP LED DOWN LIGHT

AVAILABLE IN 41W (EXCEED 100W HQI)

COOL WHITE DELIVERS 3947LM.

PRICE: N70,000+VAT.

GOOGLE FOR PICTURES AS I'M UNABLE TO DO THAT NOW. BOTH LOOK THE SAME PHYSICALLY THOUGH.

Monday, 13 March 2017

*THE MOST IMPORTANT QUESTION FIRST TIME LAND INVESTORS SHOULD BE ASKING*

Publisher unknown
*THE MOST IMPORTANT QUESTION FIRST TIME LAND INVESTORS SHOULD BE ASKING*
  
Many people, especially those who are about to make their first land transaction get confused when it comes to asking the right questions.

In some cases, intending investors ask questions like “where is the place?”, “Is it far?” and lots of other questions.
I’ve even had an encounter with someone who asked for the longitude and latitude of the land.

While these questions are not out of place and arise as a result of people trying to be careful so that they don’t make a financial commitment they would later regret, wouldn’t it be better if they knew the right questions to ask?

That brings us to the first question anyone intending to buy land should ask which is *“what is the status of the land?”*

See, before you buy land in Nigeria, it is very important that you know the status of the land!

Knowing the status of the land you are about to buy can save you a lot of money and unnecessary hassles.

Imagine buying a piece of land and erecting a building on it, just for the government to come some years after, and tell you to move out, with claims that your building is illegal because it is sitting on government property.

All these can be prevented if you know the status of the land you are investing in before sealing the transaction.
This brings us to *Land Classification*

Land can be classified as either free or acquired. A parcel of land is considered free if the government has not indicated any interest whatsoever in that land.
Such land is safe to buy because the title on the land can be perfected without issues.

In most cases, such lands will either have a gazette, a C of O or a governor’s consent.

Now that you understand what it means for land to be free, you should also know that all lands that fall within areas that are designated as urban areas are under government acquisition until deemed committed or free.

There are two types of acquisition;
*1. committed acquisition* and
*2.general acquisition*

*Committed acquisition*
A parcel of land is said to be under committed acquisition when the government has indicated an intention to use that land for a specific purpose such as provision of amenities.
Such lands belong to the government and can never be available for use by individuals.

If you purchase land that is under committed acquisition, it will be impossible for you to perfect your land title and you’ll only be occupying the land until the government comes to kick you out.

*General acquisition*
Lands that are under “general acquisition or “global acquisition can later be confirmed ‘free’ or ‘committed’.
A land under general acquisition can become free by a process called *excision*.

“Excision is a process whereby the government releases a portion of an expanse of land that is not committed"

If a parcel of land that was formerly under acquisition becomes excised, it is then considered free and becomes gazetted.

The gazette then becomes the title on the land and such land is safe to buy because a proper title can be processed on the land.

A second case where lands under general acquisition can be released is if an individual purchased a land that was under acquisition without going through an excision process.

Such lands can go through another process called “ratification” or “regularization” in which the land owner pays for the land to be ratified or regularized.

The only conditions in this case are that the land in question must not fall within a committed area and that the purpose for which the land was bought does not disrupt the original plan of the state.

Conditions for ratification may differ from state to state.

I hope by now you understand the most important question to ask when buying land in Nigeria and the kind of lands you should avoid.

If you got value from this article, please share it with others, you might just be saving someone from possible demolition in future.

What other questions do you think first time investors should ask?

*Want to get the latest updates on land matters/investment from us?*

Call, SMS or whatsapp Deji
Tel: 07054545121
+2347037805471
+2348051158191

Thursday, 9 March 2017

Earn real money online

Earn real money online by working as a part time job, easily earn up to 2500$ dollars weekly guranteed join link http://dutyscreen.com/?ref=58497 , Its Real cuz am cashing out , Best Believe It .

Friday, 3 March 2017

Savings While You Drive Tips

Savings While You Drive Tips

Odusina Adewale Hiworks

True or False,  when you are driving at full speed-upto 60-80miles per hour, use air-conditioning system for ⛽ economy or savings on fuel.

Well,  can you drive with your windows up and Ac off? then you will have much more savings.

Have you ever put your hand out of the window, while the vehicle is on top speed, remember the wind pressure pulling your hand backward?

That is exactly what the back wind screen of the vehicle would do when your windows are down at top speed.

Your vehicle will be exerting more energy to create movement against weight of the vehicle and negative air pressure caused by the windows open.

That wind pressure can actually bring the car speed down if allowed and to a halt.

When your windows are up, the manufacturers of vehicles have designed body shapes to minimize the effect of the wind pressure,  but that is compromised when windows are down.

If you could drive with windows up and Ac off,  it could only result in much more savings, but if you can't, windows down at top speed is a ⛽ gulper.

For fuel efficiency, windows up at top speed and use ac for comfort,  inflate tyres to recommended pressure, buy gas from trusted stations, don't overload culturally, and service your engine as at when due and use recommended engine oil.

..and pleeeeeese don't ask me if I follow all these rules...

Thursday, 9 February 2017

The Importance of Rating a Generator Engine Correctly


     

 800-853-2073

 800-853-2073

Toggle navigation

Articles & Other Information

The Importance of Rating a Generator Engine Correctly

When looking to purchase a generator the first thing to consider is the intended use. It may seem obvious what power rating is required for an application but there are a number of factors to consider before purchasing a generator. The guidelines set forth in this article will better explain the proper application of generator drive engines in AC Generator Set installations.

Standby Power Rating

Standby power rated generators are the most commonly rated generator sets. Their primary application is to supply emergency power for a limited duration during a power outage. With standby rated generators there is no overload capability built into the units. It is important to note that standby rated generators, under no circumstances, should run in conjunction with a public utility source.

Standby power rating should be applied to the unit where public utility power is available. The typical rating for a standby engine should be sized for a maximum of 80% average load factor and roughly 200 hours per year. This includes less than 25 hours per year of running time at the standby rating. Standby power ratings should never be applied except in true emergency outage situations. Predetermined outages with the utility company, under UL guidelines, are not considered emergency outages. Manual load shifts for testing purposes can be performed with most automatic transfer switches.

Prime Power Rating

Prime power rated generators should be used in applications where the user does not purchase power from a public utility. Prime power applications fall under two distinct categories:

Indefinite Running Time

The prime power rating is the maximum power accessible at the variable load for an unlimited number of hours per year in a variable load setting. It is not advisable that the variable load exceed 70% average of the prime power rating during any operational period of 250 hours. If the engine is running at 100% prime power, yearly hours should not exceed 500. Overload situations should be avoided however a 10% overload capability is available for a 1 hour period within a 12 hour cycle of operation.

Limited Running Time

Prime power is accessible for a limited number of hours in non-variable load situations. Limited prime power is intended for circumstances where power outages are expected, such as a planned utility power reduction. Engines in generator sets may operate up to 750 hours per year at power levels less than the maximum prime power rating. In these situations it is important to never exceed the prime power rating. The end user should be aware that constant high load use will reduce the life of any engine. It is recommended that any application requiring over 750 hours per year that the engine be continuous power rated.

Continuous Power Rating

Continuous power rating is used in applications where supplying power is at a constant 100% load for an unlimited number of hours each year. Continuous power rated units are most widely used in applications where the power grid is unreachable. Such applications include mining, agriculture or military operations.

Elevations and Temperature’s Effect on Power Rating

Elevation and temperature are factors to consider before rating the engine. The engine may be operated at 3,000 ft. of altitude and at a temperature of 100° F without deration for standby power rating. For prime power rating the engine may be operated at 5,000 ft. of altitude and at a temperature of 100° F without power deration. For continuous duty operations at higher altitudes, the engine should be configured to limit performance by 3% per 1,000 ft. of altitude and 1% per 10° F inlet air temperature.

More information on power ratings is available under guideline ISO 3046, specifically BS 5514 and DIN 6271. It is always best to consult an electrical contractor or a generator specialist to determine what generator and rating best suits your specific needs.

>>Back to Articles & Info<<

Toggle navigation

Call: 800-853-2073 or 303-659-2073

     

Diesel Service and Supply 1999-2016. All rights reserved. Location in Brighton, Colorado. 303-659-2073.
We buy, sell and ship worldwide! Caterpillar, Cummins, Kohler, Detroit, Generac and all other brand
names are trademakrs or their individual respective companies.

Friday, 3 February 2017

Confession of Faith

#AFFIRMATIONTRAIN 28TH JANUARY.

I affirm that I am a child of God, created in His very image of love. The love of God is shed abroad in my heart by the Holy Ghost which is given unto me. I have the capacity to love like my heavenly Father who gave up Jesus to die for the sins of the whole world. The love of Christ has taken a hold of me and I am manifesting this love, thereby reaching out to my world with love. I refuse to allow anger, bitterness and hatred take his root in my heart. My life is the expressions of the Father's will; as I seek to do only those things that are honorable and pleasing to Him, my increase, progress and prosperity are evident for all to see. I am complete in Christ; there's nothing missing nor lacking in my life! Down in my heart is an ability to be a blessing to my world, therefore, irrespective of how life turns, I will still be a source of blessing to humanity. My life is filled with grace; there's no man nor institution with the capacity to disfavor me in life. Before I ever show up, favour speaks loud for me. Glory to God!



Good Morning, God Bless you big
( Credit : Affirmation Train )